3 Installation
Note:
Ensure that there is free access to the electrical connections as well
as to the cabinet. The approved bending radius of the connected
cables must not be exceeded.
• Drill eight holes (four per unit) at the marked positions and insert dowels*.
* The dowels are not part of the delivery (and thus not illustrated in the figure) since the suitable type
depends on the on-site conditions (the material of wall). Therefore, use dowels that are appropriate
for the mounting surface.
• Use a cap nut or locknut to screw the eight M8 dowel screws into the dowels.
• Use a hex wrench, opening 17 (old standard) or 16 (new standard), to loosen the
M10 hexagon head screws (four per unit) by which the mounting brackets are
fastened to the cabinet sides.
• Mount the mounting brackets to the screws, and fasten them using the M8
washers, locking rings, and hex nuts that are part of the wall mounting kit.
• Hang the cabinets into the brackets and fasten them with the M10 hexagon head
screws*.
Plain washer M8
Locking ring M8
Hex
nut
M8
* If other screws than the ones delivered by the supplier are used for fastening, these must have a
diameter of at least 8 mm and an appropriate length (depending on the dowels). Additionally, make
sure they are adequate for supporting a maximum weight of 50 kg per unit.
For mounting both cabinets as one unit, a cabinet combining kit is available. The
according mounting procedure is explained in the following chapter.
ID No: 161692
Dowel
screw
M8

figure 3-2 Wall mounting procedure

PRELIMINARY
M10 hexagon head screws
G0987Z0
Page 15