Precor C954i Owner's Manual page 13

Commercial treadmill
Hide thumbs Also See for C954i:
Table of Contents

Advertisement

C
O
M
M
E
R
C
Remove the
Diagram 5
shipping
fasteners from
the left side front
panel.
Shipping
fasteners found
on left and right
sides of the front
panel.
Left side
mounting bracket
5. Attach the left side upright support. Diagram 5. Take the following steps.
a. Remove the shipping fasteners from the front panel. With the supplied
hex key and a ½-inch box end wrench, loosen and remove the two bolts
and nuts on the left side of the front panel. These fasteners hold the front
panel in place during shipping. (The front panel will drop slightly when
you remove the fasteners.) Discard the nuts, but keep the bolts.
Diagram 6
Secure the left
upright support.
Screws (D),
washers (E),
and barrel
spacers (F)
Left upright
support
Shipping
fasteners with
washers (B)
b. Attach the left upright support by placing it inside the base mount and align-
ing the mounting holes. Obtain two long sockethead screws (D), washers (E)
and barrel spacers (F) from the Hardware kit. Place a washer and barrel
sleeve on each screw and insert the fasteners through the side of the upright
support and into the base mounts. Use the ¼-inch hex key to secure the
screws, but leave room for adjustments. See Diagram 6, #1 and #2.
c. Remove two stainless steel washers (B) from the Hardware kit and place
a washer on each of the two shipping fasteners. Reinsert the two shipping
fasteners removed in step 5a, and finger tighten. See Diagram 6, #3.
I
A
L
P
R
O
D
1
U
C
T
S
D
I
V
2
3
I
S
I
O
N
page 13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

C956i

Table of Contents