Installing Power Distribution Unit (1U) - Fujitsu ETERNUS AF250 S2 Configuration Manual

All-flash arrays storage
Hide thumbs Also See for ETERNUS AF250 S2:
Table of Contents

Advertisement

Chapter 2
Rack Installation
2.1
Power Distribution Unit Installation (for Regions other than the EMEIA, Central American, and Caribbean Regions)
2.1.1

Installing Power Distribution Unit (1U)

This section describes how to install the 1U power distribution unit in a rack.
1
Remove the two brackets temporarily attached to the power distribution unit.
Remove the two M3 screws from the front of the power distribution unit to free the brackets.
Bracket A
M3 screw
2
Attach the brackets and holders to the rack.
Screw
holder
M6 screw
The four M6 screw positions for the brackets are determined relative to the power distribution unit base
line.
The four M6 screws should be inserted in the 1st and 3rd holes above the base line.
3rd hole
(M6 screw)
1st hole
(M6 screw)
Power distribution unit
Bracket B
M3 screw
Bracket A
Holder
Holder
(Rack pillar: rear)
M6 screw
(Rack pillar: rear)
[Left]
1U
Power distribution unit
Power distribution unit
base line
Bracket
FUJITSU Storage ETERNUS AF250 S2, ETERNUS AF250 All-Flash Arrays Configuration Guide (Basic)
Copyright 2017 FUJITSU LIMITED
Bracket B
Screw
holder
[Right]
3rd hole
(M6 screw)
1st hole
(M6 screw)
24
P3AG-1832-04ENZ0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus af250

Table of Contents