Assembly - Poulan Pro Front Line Tiller VF550 Operator's Manual

Front line tiller
Table of Contents

Advertisement

TO INSTALL DEPTH STAKE (See Fig. 4)
Remove screw(s) securing depth stake to skid and
discard the screw(s).
Slide depth stake down into transport arm track, lin-
ing up a hole in the depth stake with hole in transport
arm.
Install clevis pin and hairpin clip.
TILLING WIDTH
Tilling width may be adjusted to better handle your
tilling con di tions (See "TINE ARRANGEMENT" in the
Service and Adjustments section of this manual.)
TINE OPERATION
Check tine operation before first use. (See "TINE
OPERATION CHECK" in the Service and Adjustments
section of this manual.)

ASSEMBLY

DEPTH
STAKE
CLEVIS PIN
HAIRPIN CLIP
Fig. 4
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

96082001500433552

Table of Contents