Mounting Steps With Threaded Connection Or Housing - T&D VEGAWELL 52 Operating Instructions Manual

Hydrostatic absolute pressure transmitter for gauge measurement in water and wastewater
Table of Contents

Advertisement

4 Mounting
Mount into the vessel
Mounting into the basin
14
4.4 Mounting steps with threaded connection or
housing
Fig. 6: Plastic housing
1
Housing
Seal
2
3
Thread
Mount VEGAWELL 52 as follows:
Weld the welded socket G1½ A or 1½ NPT to the vessel top
1
Shift transmitter through the mounting boss
2
Turn the thread with seal into the socket and tighten with SW 46
3
Removal is carried out in reverse order.
Mount VEGAWELL 52 as follows:
Fasten the mounting bracket at the suitable height on the basin
1
wall
Lead the transmitter through the opening of the mounting bracket
2
and the counter nut
Fasten counter nut with SW 46 on the thread
3
Seal the 1½ NPT thread with teflon, hemp or a similar resistant material.
2)
1
2
3
VEGAWELL 52 • 4 ... 20 mA
2)

Advertisement

Table of Contents
loading

Related Products for T&D VEGAWELL 52

Table of Contents