How To Prepare Machine For Operation - Clarke US1500DC 01540A Operator's Manual

Ultra speed burnisher 120v & 240v with nema plug
Hide thumbs Also See for US1500DC 01540A:
Table of Contents

Advertisement

Available languages

Available languages

HOW TO PREPARE THE MACHINE FOR OPERATION
How To Install the Pads
WARNING:
Always remove the electrical plug from the electrical outlet
before installing or changing the pad.
The pad driver assembly is on the bottom underside of the
machine. The pad holder holds the pad in position. The
machine has a screw-on pad holder. To install the pad, follow
this procedure:
1. Lock the handle in the verticle position.
2. Position the handle on the fl oor, so that the machine is laying
on its back. See Figure 2.
3. Unscrew the pad holder (A).
4. Carefully center the pad on the pad driver (B). Failure to center
may cause vibration and operator fatigue.
5. Screw the pad holder (A) into position.
6. Return the machine to an upright position.
Clarke
Operator's Manual (EN) - Ultra Speed Burnisher
®
ENGLISH
EN
A
B
Figure 2
FORM NO. 71280A - 7 -

Advertisement

Table of Contents
loading

Table of Contents