Chapter8 Cpu Module Start-Up Procedures; Procedure Before Operating In Safety Mode - Mitsubishi MELSEC User Manual

Safety programmable controller
Table of Contents

Advertisement

8
CPU MODULE START-UP PROCEDURES

CHAPTER8 CPU MODULE START-UP PROCEDURES

This chapter describes the procedure for starting up the CPU module.
It is assumed that programs and parameters have been created separately.

8.1 Procedure before Operating in SAFETY MODE

This section describes the procedure before operating the CPU module in SAFETY
MODE.
The default operation mode of the CPU module is TEST MODE. Switch the mode to
SAFETY MODE to operate the CPU module.
Installing a base unit
Install a base unit to a panel.
Installing modules
Install modules required for the system configuration to the base unit.
Fixing modules by screws
Fix the modules to the base unit with screws to prevent the displacement by vibrations or
other causes.
Wiring
1) Wire the power supply to the power supply module.
2) Install wiring between the CC-Link Safety master module and the CC-Link Safety remote
I/O module.
3) Wire external device(s) to the CC-Link Safety remote I/O module.
4) Install wiring between network modules.
Making initial settings of modules
1) Set the RUN/STOP/RESET switch of the CPU module to the STOP position.
(Set the CPU module to stop status.)
2) Make switch settings for the MELSECNET/H module.
8
- 1
8.1 Procedure before Operating in SAFETY MODE
Start
(To the next page)
• • •
CHAPTER 10
• • •
CHAPTER 2,
CHAPTER 10
• • •
CHAPTER 10
• • •
CHAPTER 10
• • •
CHAPTER 4
MELSECNET/H Network
System Reference Manu
(PLC to PLC network)

Advertisement

Table of Contents
loading

This manual is also suitable for:

QscpuQs series

Table of Contents