4) AMD Socket FM2 / FM1 / AM3+ / AM3 / AM2+ / AM2 Installation
① Install Bolts to the Backplate according to the Socket Type and secure
with Side Caps.
② Remove the Sticker Cover from the Lower Tier of the Loading Block and
attach to the Backplate.
③ Attach Dobule-sided Tape to the Loading Block and remove
the Double-sided Tape Cover.
Double-sided Tape
Caution
Please make a note of the orientation of the Loading Block.
WWW.ZALMAN.COM
1
Loading Block
O
X
8