QQ
3 7 63 1515 0
3-3.
ARM (SUCTION)
TE
L 13942296513
3-4.
LEVER (LDG-A) / (LDG-B)
shaft A
www
1 Fit the lever (LDG-A) on
shafts A – C and install it.
.
http://www.xiaoyu163.com
projection
shaft B
shaft C
x
ao
u163
y
i
http://www.xiaoyu163.com
2 9
8
Q Q
3
6 7
1 3
1 5
co
3 type-E stop ring 2.0
2 Fit the lever (LDG-B) on
.
XR-CA610X
9 4
2 8
2 Move the arm (suction) in the arrow
direction and fit on projection.
1 Fit the arm (suction) on the shaft.
0 5
8
2 9
9 4
2 8
shaft A
shaft B
m
shafts A and B and
install it.
9 9
9 9
13