XR-CA630X
3-3.
ARM (SUCTION)
projection
3-4.
LEVER (LDG-A) / (LDG-B)
shaft A
1 Fit the lever (LDG-A) on
shafts A – C and install it.
12
shaft B
shaft C
2 Move the arm (suction) in the arrow
direction and fit on projection.
1 Fit the arm (suction) on the shaft.
3 type-E stop ring 2.0
2 Fit the lever (LDG-B) on
shafts A and B and
install it.
shaft A
shaft B