Required Equipment; Unpacking And Inspecting The Switch - Cisco Nexus 5600 Series Hardware Installation Manual

Hide thumbs Also See for Nexus 5600 Series:
Table of Contents

Advertisement

Required Equipment

Required Equipment

Before beginning the installation, ensure that you have the following items available:
The following additional items (not found in the accessory kit) are required to ground the chassis:

Unpacking and Inspecting the Switch

When handling switch components, wear an ESD strap and handle modules by their handles and carrier
Caution
edges only. An ESD socket is provided on the chassis. For the ESD socket to be effective, the chassis
must be grounded through the power cable, the chassis ground, or the metal-to-metal contact with a
grounded rack.
Keep the shipping container in case the chassis requires shipping in the future.
Tip
The switch is thoroughly inspected before shipment. If any damage occurred during transportation or
Note
any items are missing, contact your customer service representative immediately.
Cisco Nexus 5600 Series Hardware Installation Guide
2-4
Use the following screw torques when installing the switch:
Captive screws: 4 in-lb (0.45 N
M3 screws: 4 in-lb (0.45 N
M4 screws: 12 in-lb (1.36 N
10-32 screws: 20 in-lb (2.26 N
12-24 screws: 30 in-lb (3.39 N
Four 12-24 or 10-32 screws for attaching slider rails to the rack
Number 1 and number 2 Phillips screwdrivers with torque capability
3/16-inch flat-blade screwdriver
Tape measure and level
ESD wrist strap or other grounding device
Antistatic mat or antistatic foam
Grounding cable (6 AWG recommended), sized according to local and national installation
requirements; the required length depends on the proximity of the switch to proper grounding
facilities
Crimping tool large enough to accommodate the girth of the lug
Wire-stripping tool
Chapter 2
·
m)
·
m)
·
m)
·
m)
·
m)
Installing the Cisco Nexus 5600 Series Switches

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents