Samsung VP-L900 Training Manual page 123

8mm camcorder
Hide thumbs Also See for VP-L900:
Table of Contents

Advertisement

Deck Operating Description
7-4-2 Loading
* This operation makes tape loading.
Arm Loading S,T move in
direction of arrows and
Pole Base S, T Slide
Motor Loading stops
slightly and then rotates
forward
Slider Main moves to
left.
Pinch Roller attaches to
Capstan Shaft.
Pinch Roller rotates
Backward and then
forward
Arm Pinch Roller is
rotated by Silder Main
and Pinch Roller
detaches from Capstan
Shaft.
7-14
Motor Loading rotates.
Gear Worm Loading
Gear Loading
Gear Wheel Motor
Switch Mode
Gear Cam Main rotates.
Arm Tension, Arm
Review and Arm Pinch
Roller shift.
Pole Base S, T attach to
base Drum
Motor Loading stops
Motor Loading rotates in
reverse and then stops.
Cassette in
Housing down.
Chassis Sub moves in
direction of arrow.
Chassis Sub stops at
Loading-complete
position and contacts
rail of Main Chassis.
Brake sub S assy
released
Arm Tension rotates in
direction of arrow
slightly, and Lever Brake
S, Brake Main T contact
Reel for braking
Motor Capstan rotates
Drum rotates
forward.
Gear Capstan, Belt Timing,
Gear Pully and Gear ldler
Reel S rotates.
Motor Castan stops
Motor Capstan rotates
forward slightly (for shifting
idler to Reel T) and stops.
Motor Capstan rotates
back.ward silghtly and
Reel S rotates counterclockwise
slightly, and then Reel
Drum stops.
Motor Capstan stops.
in reverse.
rotates.
forward.
Samsung Electronics

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vp-l906Vp-l907

Table of Contents