7
Click Use recommended settings.
The Review your time and date settings page is displayed.
8
Set Time zone, Date and Time, and click Next button.
The Select your computer's current location page is displayed.
9
Click the network in which you use the computer.
After the computer is restarted automatically, the login screen is displayed. This completes the
setup procedure.
2-1-2
Creating Recovery Image of Initial State
You can back up the Industrial PC in the state immediately after the Windows setup is completed.
If Windows or Real-Time OS (Controller function) malfunctions while the Industrial PC is operated,
with the backup data you can restore the Industrial PC to the state immediately after the Windows set-
up is completed.
You can use the Rescue Disk Utility for backing up. Refer to 7-1 Backing up and Recovering the In-
dustrial PC System on page 7 - 2 for details and procedures on backing up and recovering with the
Rescue Disk Utility.
2-1-3
Installing Software
When there is any software required for using the Industrial PC, you can install it.
• Internet browser
• Firewall software
• Anti-virus software
Precautions for Safe Use
To ensure security, it is strongly recommended to install firewall and anti-virus software and
keep them updated in the latest state.
Precautions for Correct Use
Confirm the IT policy at your company for available software as well as for the security require-
ments and environment for the Industrial PC.
Installing Internet Browser
The Industrial PC does not have an internet browser pre-installed for security reasons. An executable
file for browser installation is provided in D:\OMRON-NY\Installers.
Execute an installer that corresponds to the type of your Windows (32 or 64 bit) and your language
(Japanese or English).
Precautions for Safe Use
Install all updates and ensure the browser stays up-to-date.
NY-series Industrial Panel PC / Industrial Box PC Setup User's Manual (W568)
2 Initial Settings
2
2 - 3