THUNDER TIGER mini Titan E325 Manual page 18

Hide thumbs Also See for mini Titan E325:
Table of Contents

Advertisement

Main Frame Assembly-5
No.
Material No.
Description
1
HMC2-14B
Socket Screw M2x14
M2 Nut
2
HML2
3
HME3-3B
Set Screw
4
HMV1150X
Bearing d5xD11x5
Main Shaft Lock Ring
5
BK1020
1.Install the Bearing into the Base Plate.
2.Slide the Main Gear Assembly into the Main Frame.
3.Slide the Main Shaft through the Upper BRG Housing, the Main Gear Assembly and the
Lower Bearing.
4.Line up the holes of the Autorotation Tail Drive Gear, the One Way Bearing Shaft and the
Main Shaft. Insert the Socket Screw and fix it with a M2 Nut. Do not forget to add some
Loctite and do not over tighten the screw.
5.Push the Main Rotor Hub downward slightly and put on the Main Shaft Lock Ring under
the Base Plate. Secure the Main Shaft Lock Ring with a Set Screw through the hole beside
the Base Plate. Make sure there is no play of the Main Shaft.
Note:
Use access
hole to tighten set screw
Qty
1
1
1
1
1
T22
(2)
(3)
(1)
(4)
(5)
Bag G
-17-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents