Safety connections and testing for leaks
Installation instructions
safety assembly block
Install the safety lines.
Min. cross−sections
H Safety valve
Inlet connection
40 kW
. . . . . . . . . . . . . . . . . . . . . . . . . .
50 to 100 kW
Blow−off line
40 kW
. . . . . . . . . . . . . . . . . . . . . . . . . .
50 to 100 kW
H Line to the
diaphragm
expansion vessel
Permiss. operating pressure
Test pressure
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
DHW connections
DHW cylinder installation instructions
DN 15 (R ½")
DN 20 (R ¾")
. . . . . . . . . . . .
DN 20 (R ¾")
DN 25 (R 1")
. . . . . . . . . . . .
DN 20 (R ¾")
. . . . . . .
3 bar
. . . . .
4 bar
Low water indicator
Tests have verified that the
requirements to EN 12828 have been
met.
This makes an additional low water
indicator unnecessary.
Note
Equip boilers with a safety valve
which is type−tested and meets the
requirements of TRD 721 or local
regulations. Safety valves must be
marked subject to the respective
system version.