Preparing The Mating Faces; Lift The Machine To Where It Will Be Installed, And Position It; Preconditions For Correct Alignment And Secure Attachment - Siemens 1LA8 Operating Instructions Manual

Simotics tn series induction motor
Table of Contents

Advertisement

5.1.4

Preparing the mating faces

Prepare the foundation faces dependent on the machine type:
● Mounting on a foundation
● Flange connection
● Wall mounting
5.2

Lift the machine to where it will be installed, and position it

5.2.1

Preconditions for correct alignment and secure attachment

Detailed specialist knowledge of the following measures is required in order to correctly align
and securely fit the equipment.
● Preparing the foundation
● Selecting and mounting the coupling
● Measuring the concentricity and axial eccentricity tolerances
● Positioning the machine
If you are not familiar with the prescribed measures and procedures, then you can make use
of the services offered by the local Service Center (Page 137).
SIMOTICS TN Series N-compact 1LA8
Operating Instructions 05/2016
– Ensure that the foundation faces are flat and free of contaminations.
– Check the dimensions of the mounting-foot holes, if necessary.
– Clean the flange before installation, and make sure that the flange faces are flat and
free of contaminations.
– Check the dimensions of the flange geometry, if necessary.
– Ensure that the wall faces are flat and free of contaminations.
– Check the dimensions of the mounting-foot holes, if necessary.
Note
Wall mounting
Machines that are attached to the wall by their mounting feet because of their type must
be supported from below by a wall strip, for example, or pinned.
5.2 Lift the machine to where it will be installed, and position it
Assembly
45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simotics tn seriesSimotics tn 1pq8

Table of Contents