Starting Up: Filling And De-Aerating The Boiler And Installation; Requirements Of The Water System - Rinnai E60SRN Installation & Service Instructions Manual

Table of Contents

Advertisement

10

Starting up: Filling and de-aerating the boiler and installation

!
CAUTION
i
NOTICE
i
NOTICE
!
WARNING

10.1 Requirements of the water system

!
WARNING
!
WARNING
i
NOTICE
CAUTION
Observe the following rules of safety:
-
All work on the unit must take place in a dry environment.
-
Rinnai units may never be in operation without their housing, except in connection
with maintenance or adjustments (see Chapter 132 and 14).
-
Never allow electrical or electronic components to come into contact with water.
NOTICE
Carry out the following tasks in connection with maintenance, etc. to an already-
installed unit:
-
Shut down all programs
- Close the gas shut off valve
- Shut off the power at the main power switch
-
Close the service valves (system supply and return)
NOTICE
Take note of the following when maintenance or adjustments are needed:
-
The unit must be able to function during these activities; for this reason, the unit's
supply voltage, gas pressure and water pressure must be maintained. Ensure that
this is not a source of potential danger during these activities.
Following maintenance or other activities; always check the installation of all
parts through which gas flows (with bubble test using leak-search spray).
Before filling the heating system, the complete system, including all zones, must be
thoroughly cleaned and flushed to remove sediment. Flush until clean water runs
free of sediment. Rinnai suggests using an approved system cleaner to flush the
system, but not the boiler. Always use Rinnai approved antifreezes. See the list at
the end of this chapter. Never use reverse osmosis, deionized, or distilled water for
filling the heating system.
Do not use petroleum-based cleaning or sealing compounds in the boiler
system. Damage of seals and gaskets in boiler and system could occur,
resulting in property damage.
The central heating installation needs to be filled with potable water.
Use only potable water or approved glycol for filling the heating system.
When the water hardness of the filling water exceeds > 10.5 gpg (200 mg/L) the
water has to be treated until below the maximum value of 10.5 gpg (200 mg/L).
The pH value of the installation water must be between 6.5 and 8.5.
Check the pH value using proper equipment or by having the water analyzed by a
water treatment company.
If pH differs from above, contact Rinnai engineering for further assistance.
Component or product damage as a result of failing to adhere to the water
quality requirements will not be covered by the limited warranty.
49

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E85srnE110srnE85srpE60srpE110srpE60sr ... Show all

Table of Contents