Static Filling - AEG Favorit CE Instruction Book

Table of Contents

Advertisement

7.
Water Inlet
The water flows into the regeneration dosage chamber via inlet valve, over air break, into regeneration
dosage chambers and into softener
The level control chamber built into the sump operates the pressure switch.
8.

Static filling

-
Static filling until pressure switch point.
failure code:
If this point isnt reached after max. 2 minutes, a failure code is displayed and the program is
stopped. The program phase display PPD-LED LD9 is blinking.
LD9
LD10
LD11
Spares Operation - R.Kurzke 02/02
- 13 -
599 513 616 EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents