Follett MCD425A/W Operation And Service Manual page 26

Table of Contents

Advertisement

6. Lower bottom bearing assembly into
evaporator mounting base .
7. While maintaining firm downward pressure
on bottom bearing assembly, tighten hex
head bolt with a 5/16 wrench .
8. Position evaporator over lower bearing
assembly and align grooves with pins in
bearing assembly .
9. Install vee band clamp and nut to 70 in/lb .
(Fig. 5) .
Note: Clamp must be oriented as shown
in order for the insulation to be placed
properly .
10. Place auger in center of evaporator and
rotate to mate with drive pin .
11. Install ice compression loop, orienting loop .
12. Install upper bearing and seal assembly,
rotating bearing to slip pin into auger slot .
13. Install upper vee band clamp and nut to
70 in/lb .
14. Install evaporator insulation .
15. Install compression nozzle and tubing .
16. Secure ice transport tube with clamp
(Fig. 6.1) .
Note: Clamp must be oriented as shown
in order for the insulation to be placed
properly .
17. Install compression nozzle insulation
(Fig. 6.2) .
18. Install vent and drain tube (Fig. 6.3) .
19. Install top bearing insulation (Fig. 6.4) .
Gearmotor replacement
1. Disassemble evaporator .
2. Disconnect the wire connectors .
3. Remove 4 screws holding gear motor
mounting plate to base of ice machine and
lift gearbox and motor clear of ice machine .
4. Remove machine screws holding mounting
plate to motor .
5. Install new motor in reverse order .
26
MCD425A/W, R425A/W, MFD425A/W, P425A/W Ice Machines
Fig. 5
Fig. 6
4
3
3
2
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mfd425a/wR425a/wP425a/w

Table of Contents