INSTALLATION
On Bypass Common
Non-Master UPS – On Bypass NO
NOT USED
Bypass Voltage Phase A – Non-Master UPS
Bypass Voltage Phase B – Non-Master UPS
Bypass Voltage Phase C (9315)/Neutral (9390/9395)
Load Voltage Phase A – Master Source
Load Voltage Phase B – Master Source
Load Voltage Phase C (9315)/Neutral (9390/9395)
Bypass Voltage Phase A – Master Source
Bypass Voltage Phase B – Master Source
Bypass Voltage Phase C (9315)/Neutral (9390/9395)
Load Voltage Phase A – Non-Master UPS
Load Voltage Phase B – Non-Master UPS
Load Voltage Phase C (9315)/Neutral (9390/9395)
Bypass Voltage Phase A Return (9315 only) (Non-master UPS)
Bypass Voltage Phase B Return - Non-Master UPS
Bypass Voltage Phase C Return (9315 only) (Non-master UPS)
NOT USED
Building Alarm 1 – Non-Master UPS (see Note)
Building Alarm 1 Return – Non-Master UPS
Building Alarm 2 – Non-Master UPS (see Note)
Building Alarm 2 Return – Non-Master UPS
NOT USED
NOT USED
NOT USED
NOT USED
NOT USED
NOT USED
NOT USED
Jumper
NOTE If a Building Alarm is being used for another purpose, any unused building alarm on the 9315/9390/9395 UPS can be used for the Sync Control.
Figure 3‐3. Eaton Fixed Master Sync Control TB1 Terminal Block Detail
S
3-3
P-164000023 Rev 1 www.eaton.com/powerquality
Eaton 9315/9390/9395 Fixed Master Sync Control Installation and Operation Manual