2. How to install
2-3 Physical Installation: Base Guide
It is more convenient to install from the bottom to the top side when the sets are
to be installed on a floor.
- First row alignment is most important
- Must use line lasers level tool to align Vertical / Horizontal
- When rubber pad or a bracket is input between bottom of LED module and a cover-frame,
it can reduce a gap of module~module by preventing a sagging of LED module.
(Refer to the bottom figure and page 70)
Base Guide side
Samsung Electronics
line lasers
Rubber pad
line lasers
level tool
LED Display Installation