2. How to install
2-3 Physical Installation : Open Packaging
[ Before Unpacking ]
Stack to maximum 12 layers
1) Remove the tape from the upper side of the box, and then open up.
2) Remove the Top–Cushion
3) Take out the set while
PE-bag
* Do not keep the LED display face down to ground
Samsung Electronics
holding the handle
[ Unpacking ]
Top-Cushion
handle
LED set
inside the PE-Bag, and then remove the
IB & cable
LED Display Installation