Section 5: Installation; Kit Contents; Required Tools - Pentair IC60 Installation And User Manual

Electronic chlorine generator
Table of Contents

Advertisement

This section describes how to install the IntelliChlor Electronic Chlorine Generator into the pool plumbing
system. Also, included are connection instructions for IntelliTouch, EasyTouch and SunTouch systems. Before
installing, review the IntelliChlor kit contents and required tools.
Note: For Power Center installation instructions, see the "IntelliChlor Power Center Installation
Guide" (P/N 520590).
Note: Salt is not provided. For details about the type of salt to use, see "What Type of Salt to Use,"
on page 11.

Kit Contents

- One IntelliChlor Electronic Chlorine Generator
- Two (2) cell union with two (2) o-rings
- User's Guide (this manual)

Required Tools

- Tape measure
- Phillips and flathead screwdriver
- Pliers
- Hacksaw
- An NSF® approved all purpose PVC/CPVC/ABS cleaner primer
- An NSF® approved all purpose PVC/CPVC/ABS cement
WARNING!
DANGER: RISK OF ELECTRIC SHOCK, WHICH CAN RESULT IN SERIOUS INJURY OR DEATH.
Before attempting installation of service, ensure that all power to the circuit supplying power to the
system is disconnected/turned off at the circuit breaker. It is recommended, but not mandatory that the
IntelliChlor Power Center be connected to a circuit protected by a ground fault circuit-interrupter (GFCI).
Grounding (earth bonding) is required. The unit should be installed by a qualified service person and
grounded.
Install to allow access to cell buttons and power center.
Read Safety Precautions and Important Instructions (page ii and iii). Before attempting any
electrical wiring, be sure to read and follow Safety Instructions. Wiring should only be
performed by a qualified professional.
Install the IntelliChlor unit a minimum of three (3) feet away from the heater outlet.
Pipe couplings: Schedule 80, maximum pressure 150 psi at 70° F (21° C).
Note: Operate unit with minimum flow of 25 gpm. For high flow applications, use a bypass loop (see
page 4) for best flow sensing.
Note: Provide at least 12"-18" of straight pipe in front of the cell inlet.
When using electrical products, basic precautions should always be followed,
including the following:
IntelliChlor Electronic Chlorine Generator Installation and User's Guide
Section 5
Installation
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ic40Ic15Ic20

Table of Contents