York P*UR Installation Instructions Manual page 17

High efficiency gas-fired furnaces tubular heat exchanger series
Hide thumbs Also See for P*UR:
Table of Contents

Advertisement

035-17477-001 Rev. A (801)
OVERHANG
12" MINIMUM
VENT
90°
COMBUSTION AIR
FIGURE 19 : Horizontal Termination Raised
Configuration for Additional Clearance
OVERHANG
12" MINIMUM
VENT
90°
18" MAX.
COMBUSTION AIR
FIGURE 20 : Horizontal Termination Configuration with Hori-
zontal Extension
12" VERTICAL SEPARATION
BETWEEN COMBUSTION
AIR AND VENT
VENT
FIGURE 21 : Vertical Termination
Unitary Products Group
12 SEPARATION BETWEEN
BOTTOM OF COMBUSTION AIR
AND BOTTOM OF VENT
MAINTAIN 12" CLEARANCE ABOVE
HIGHEST ANTICIPATED SNOW LEVEL
OR GRADE WHICHEVER IS GREATER
12 SEPARATION BETWEEN
BOTTOM OF COMBUSTION AIR
AND BOTTOM OF VENT
MAINTAIN 12" CLEARANCE ABOVE
HIGHEST ANTICIPATED SNOW LEVEL
OR GRADE WHICHEVER IS GREATER
COMBUSTION AIR
MAINTAIN 12" MINIMUM
CLEARANCEABOVE HIGHEST
ANTICIPATED SNOWLEVEL.
MAXIMUM OF 24" ABOVE ROOF.
VENT
COMBUSTION AIR
FIGURE 22 : Double Sidewall Termination
FIGURE 23 : Double Rooftop Termination
VENTING MULTIPLE UNITS
Each unit must have its own intake/vent piping and termina-
tion. Do not use common pipes for combustion air or venting.
The vent terminals must be located as shown in Figure 22 or
Figure 23.
PIPING ASSEMBLY
The final assembly procedure for the vent/combustion air pip-
ing is as follows:
1.
Cut piping to the proper length, beginning at the furnace.
2.
Deburr the piping inside and outside.
3.
Chamfer the outer edges of the piping.
4.
Dry-fit the entire vent/combustion air piping assembly.
5.
Disassemble the piping and apply cement primer and
cement per the cement manufacturer's instructions.
Primer and cement must conform to ASTM D2564 for
PVC, or ASTM D2235 for ABS piping.
2"
6"
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fg9-upG9t-upP*dhFg9-dhG9t-dh

Table of Contents