Completing The Test - ABB rec670 Commissioning Manual

Intelligent electronic device
Hide thumbs Also See for rec670:
Table of Contents

Advertisement

1MRK 511 360-UEN A
10.9.1.5
Bay control REC670 2.1 IEC
Commissioning manual
Testing functionality by secondary injection
SESRSYN
CBConfig
setting
SESRSYN 2
Tie CB
(Operates on
TIE_QA1)
SESRSYN 3
1 ½ bus
(Operates on
alt. CB
WA2_QA1)
(mirrored)
WA1_QA1
(SESRSYN 1)
LINE1_QB9
LINE1
IEC11000274 V3 EN
Figure 24:
Objects used in the voltage selection logic

Completing the test

Continue to test another function or end the test by changing the TestMode setting to
Off. Restore connections and settings to their original values, if they were changed for
testing purposes.
Section to
Activated
Activated
be
B1QCLD
B2QCLD
synchroniz
input on
input on
ed
IED from
IED from
LINE1 –
LINE2
WA1 –
WA1_QA
LINE2
1
WA2 –
WA2_QA
LINE1
1
WA1 –
WA1_QA
WA2_QA
WA2
1
1
WA2 –
LINE2
WA2 –
TIE_QA1
LINE1
WA2 –
TIE_QA1
WA1_QA
WA1
1
(SESRSYN 3)
TIE_QA1
(SESRSYN 2)
LINE2_QB9
LINE2
IEC11000274-3-en.vsd
Section 10
Activated
Activated
LN1QCLD
LN2QCLD
input on
input on
IED from
IED from
LINE1_Q
LINE2_Q
B9
B9
LINE2_Q
B9
LINE1_Q
B9
LINE2_Q
B9
LINE1_Q
B9
WA1
WA2
WA2_QA1
Indication
from
SESRSYN
on IED
LN1SEL,
LN2SEL
B1SEL,
LN2SEL
B2SEL,
LN1SEL
B1SEL,
B2SEL
B2SEL,
LN2SEL
B2SEL,
LN1SEL
B1SEL,
B2SEL
149

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 seriesRelion rec670

Table of Contents