Commissioning and testing
Front panel installation
(cont.)
3. Start up the boiler and at the poten-
tiometer A select the maximum
boiler output. Check the adjustment
for the corresponding gas through-
put.
4. Flip up the control unit front and
snap into position.
Installation steps
45