Installation steps
Electrical connections
Routing connecting cables
!
Please note
Connecting cables can be damaged if they touch hot components.
When routing and securing connecting cables on site, ensure that the
maximum permissible cable temperatures are not exceeded.
1. Remove 2 screws on the underside
of the boiler and remove cover
panel.
40
(cont.)
2. Connect strain reliefs to the exter-
nal cables and clip into the mount-
ing plate aperture.
3. Fasten cover panel at the bottom.