Unloaded Full-Speed Exercise; Loaded Full-Speed Exercise (With Rxt Only); Shutdown During Exercise; Power Failure During Exercise - Kohler 38RCL Operation Manual

Residential/light commercial generator sets
Hide thumbs Also See for 38RCL:
Table of Contents

Advertisement

ATS connection. The controller verifies that the
D
Model RXT ATS interface board is connected.
Battery voltage. Battery voltage is checked before
D
exercise to verify engine starting capability. Battery
voltage provides a measurement of battery health. If
the controller detects low battery voltage, low battery
or low charging battery is displayed and the exercise
does not start.
Coolant level check. The coolant level is checked.
D
Communication integrity tests.
D
Ethernet, and USB are monitored for messages
indicating that the controller and wiring are reliable.
Engine speed. Engine speed is measured at low
D
speed and full speed. An overspeed or underspeed
condition will result in a fault condition and shutdown.
Generator output frequency and voltage.
D
Operating the generator at full speed allows the
RDC2 controller to check the output power for correct
voltage, frequency, and stability. When the engine is
running at full speed, the controller verifies that the
voltage and frequency are within acceptable limits. A
fault message is displayed if the voltage or frequency
is out of range.
Oil pressure. Oil pressure is verified to ensure
D
proper lubrication of critical engine components.
Pressure is monitored at both low and full speeds. If
the oil pressure is low, low oil pressure is displayed
and the generator set shuts down.
2.5.2

Unloaded Full-Speed Exercise

The unloaded full speed exercise runs the generator set
at full speed for 20 minutes without transferring the load.
To set an unloaded full speed exercise, follow the
procedure in Figure 2-3 and select Exercise Mode:
Unloaded Full.
2.5.3
Loaded Full-Speed Exercise (with
RXT only)
A loaded exercise starts the generator set, ramps up to
full speed, and then transfers the electrical load from the
utility source to the generator set.
transferred back to the utility source before the
generator set shuts down.
Note: With a loaded exercise, power to the building is
lost for up to 10 seconds during load transfer.
For a loaded exercise controlled by the RDC2 controller,
a Model RXT transfer switch must be connected to the
18
Section 2 Generator Set Operation
generator set. To set a loaded exercise, follow the
procedure in Section 2.5.8 and select Exercise Type:
Loaded.
For a loaded exercise with a transfer switch other than a
Kohlerr Model RXT, program the exercise at the
transfer switch controller. Refer to the transfer switch
operation manual for instructions.
2.5.4
The following advanced diagnostic operation applies to
J1939, RBUS,
RDC2 controllers with firmware versions 5.04 and
higher.
If the generator set shuts down on a fault during an
exercise, the controller will try to restart the engine. If the
engine starts, the generator set will run at full speed for
two minutes and then stop. The event history will show
Advanced Diagnostic Active. The exercise schedule is
maintained.
If the engine does not start, the shutdown message will
be displayed. Correct the fault condition and reset the
fault as described in Section 2.6.
2.5.5
If the utility power is lost during an unloaded exercise,
the ATS transfers to the emergency source, the exercise
is ended and the control remains in the AUTO mode.
If the utility power is lost during a loaded exercise, the
exercise is ended. The ATS remains in the emergency
position and the control goes into the AUTO mode.
The generator set continues to run and supply power to
the load for the duration of the utility power outage.
When Utility power is restored, the ATS will re-transfer to
the utility source through normal timing sequences.
2.5.6
To reset the exerciser to run at a different day and/or
time or to change the exercise mode, follow the
procedure in Section 2.5.7 to change the exerciser
settings.
2.5.7
The load is
When power is connected to the controller, you will be
prompted to set the date, time, and exercise schedule.
1. At power--up, the date is displayed with the year

Shutdown During Exercise

Power Failure During Exercise

Exerciser Reset

Setting the Exerciser at Power-up

flashing. Use the up or down arrow key to step to
the current year.
TP-6810 11/13

Advertisement

Table of Contents
loading

This manual is also suitable for:

48rcl60rclRdc2

Table of Contents