Pioneer XC-Z9 Service Manual page 42

Hide thumbs Also See for XC-Z9:
Table of Contents

Advertisement

1
QQ
3 7 63 1515 0
3
DVDM Assy
1
Remove the 2 screws at the rear of the DVDM Assy.
A
2
Remove the Earth Mecha Spring by removing the screw
attaching it to the unit.
3
Remove the flexible cable (x1).
2
B
1
3
C
4
Slightly lift the 05 LOADER ASSY and slide it backwards.
TE
L 13942296513
5
Remove the Mecha Barrier.
05 LOADER ASSY
D
E
5
www
F
42
1
http://www.xiaoyu163.com
2
Earth Mecha Spring
1
Top View
4
x
ao
y
.
i
2
http://www.xiaoyu163.com
3
8
6
Replace the flexible cable removed in step
extension jig cable (GGF1157) and connect it to the same
position.
7
Lift up the 05 LOADER ASSY.
7
8
Install the Front Panel Assy.
9
Q Q
Reconnect the flexible cable (x1) and the connector (x1)
3
6 7
1 3
to their original positions.
(If you removed the flexible cable (x1) from on the Touch
Panel in step
of section "2 Front Panel Assy", reconnect it
to its original position.)
8
Caution: Service cable 5P (GGD1425) is necessary for
diagnosing the DVDM Assy (SIDE B).
u163
.
XC-Z9
3
4
2 9
9 4
2 8
with an
05 LOADER ASSY
6
1 5
0 5
8
2 9
9 4
9
9
Diagnosis
m
co
4
9 9
2 8
9 9

Advertisement

Table of Contents
loading

Table of Contents