General Requirements; Related Documents - Vaillant ECOmax VUW 236 EH Instructions For Installation And Servicing

Table of Contents

Advertisement

3. General requirements

3.1 Related documents

The installation of the boiler must be in
accordance with the relevant require-
ments of Gas Safety (Installation and
Use) Regulations 1994, Health and
Safety Document No. 635 (The Elec-
tricity at Work Regulations 1989),
BS7671 (IEE Wiring Regulations) and
the bylaws of the local Water Under-
taking. It should be in accordance
with any relevant requirements of the
Local Authority, Building Regulations,
Building Standards (Scotland) Regu-
lations and the relevant recommen-
dations of the following British
Standards:-
BS 5440: Flues and ventilation of gas
fired boilers not exceeding 60 kW:
- Part 1: Flues
- Part 2: Ventilation
BS 5449: Specification for forced
circulation hot water for domestic
premises.
BS 5546: Specification for gas hot
water supplies for domestic premises.
BS 6700: Services supplying water
for domestic use within buildings and
their curtilages.
BS 6798: Specification for installation
of gas fired boilers not exceeding
60 kW input.
BS 6891: Specification for installation
of low pressure gas pipework up to
28 mm (R1) in domestic premises
(2nd family gas).
BS 7593: Treatment of water in dome-
stic hot water central heating systems.
BRITISH GAS PUBLICATION DM2:
Guide for Installation in Timber
Framed Housing
Important
The appliance must be installed and
serviced by a competent person as
stated in the Gas Safety (Installation
and Use) Regulations 1994
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecomax vuw 286 eh

Table of Contents