General Requirements; Related Documents; Boiler Location; Gas Supply - Vaillant 824/2 E Instructions For Installation Manual

Turbomax plus and thermocompact wall hung room sealed fan assisted combination and system boilers
Table of Contents

Advertisement

4 General Requirements

4 General Requirements

4.1 Related Documents

The installation of the boiler must be in accordance with
the relevant requirements of Gas Safety (Installation and
Use) Regulations 1998, Health and Safety Document No.
635 (The Electricity at Work Regulations 1989), BS7671
(IEE Wiring Regulations) and the Water Supply (Water
Fittings) Regulations 1999, or the Water Bylaws 2000
(Scotland). It should also be in accordance with the
relevant requirements of the Local Authority, Building
Regulations, Building Regulations (Scotland), Building
Regulations (Northern Ireland) and the relevant
recommendations of the following British Standard;
Including current amendments to Approved Documents
Part L and J.:
B B S S 5 5 4 4 4 4 0 0 : : Flues and ventilation of gas fired boilers not
exceeding 70 kW net:
- Part 1: Flues
- Part 2: Ventilation
B B S S 5 5 4 4 4 4 9 9 : : Specification for forced circulation hot water
for domestic premises.
B B S S 5 5 5 5 4 4 6 6 : : Specification for gas hot water supplies for
domestic premises.
B B S S 6 6 7 7 0 0 0 0 : : Services supplying water for domestic use
within buildings and their curtilages.
B B S S 6 6 7 7 9 9 8 8 : : Specification for installation of gas fired
boilers not exceeding 70 kW input net.
B B S S 6 6 8 8 9 9 1 1 : : Specification for installation of low pressure
gas pipework up to 28 mm (R1) in domestic premises
nd
family gas).
(2
B B S S 7 7 5 5 9 9 3 3 : : Treatment of water in domestic hot water
central heating systems.Institute of Gas Engineers
Publication IGE/UP/7/1998: Guide for Installation in
Timber Framed Housing. Benchmark Code of Practice.
Building Regulations Approved Documents Part L 2002
Part J 2002.
Important!
The appliance must be installed and serviced by
a competent person as stated in the Gas Safety
(Installation and Use) Regulations 1998. In IE,
the installation must be in accordance with the
current edition of IS 813 'Domestic Gas
Installations', the current Building Regulations
and reference should be made to the current
ETCI rules for electrical installation.
Preliminary remarks
This appliance should only be installed in conjunction
with a Vaillant flue system.
Install the flue system as detailed in the separate flue
installation instructions supplied with this boiler.
10
Supplied By www.heating spares.co Tel. 0161 620 6677

4.2 Boiler location

The location chosen for the boiler must permit the
provision of a satisfactory flue termination. The location
must also provide adequate space for servicing and air
circulation around the boiler. The boiler may be installed
in any room, although particular attention is drawn to
the requirements of BS7671 (IEE Regulations), the
electrical provisions of the Building Regulations
(Scotland) and in IE the current edition of IS 813 and the
current ETCI rules, in respect of the installation of a
boiler in a room containing a bath or shower.
Note!
Where a room sealed boiler is installed in a room
containing a bath or shower, any electrical
switch or boiler control utilising mains
electricity should be so situated that it cannot
be touched by a person using the bath or
shower.
Where the installation of the boiler will be in an unusual
location, special procedures may be necessary and BS
5546 and BS 6798 give detailed guidance on this
aspect. The boiler must be mounted on a flat, vertical
wall, which must be sufficiently robust to take the
weight of the boiler. The boiler may be installed on a
combustible wall, subject to the requirements of the
Local Authorities and Building Regulations.
A compartment used to enclose the boiler must be
designed and constructed specifically for this purpose.
(An existing cupboard or compartment may be used
provided that it is modified for the purpose). Details of
essential features of cupboard/compartment design
including airing cupboard installations are given in BS
6891. In IE the current edition of IS 813.
If the boiler is to be fitted in a timber framed building, it
should be fitted in accordance with Institute of Gas
Engineers Publication IGE/UP/7/1998 "Guide for Gas
Installation in Timber Framed Housing".

4.3 Gas Supply

The gas supplier should ensure the availability of an
adequate supply of gas.
A gas meter may only be connected to the service pipe
by the supplier of gas or their contractor.
An existing meter should be checked to ensure that it is
capable of passing the rate of gas supply required.
Installation pipes should be fitted in accordance with BS
6891. Pipework from the meter to the boiler must be of
an adequate size. Do not use pipes of a smaller size than
the boiler gas connection (15 mm, 22 mm for 837/637).
The complete installation must be tested for soundness
and purged as described in BS 6891.
Instructions for Installation and Servicing turboMAX plus and thermoCOMPACT R1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents