General Requirements; Related Documents - Vaillant TURBOmax Pro 28 Instructions For Installation And Servicing

Wall hung room sealed fan assisted combination boilers
Table of Contents

Advertisement

Ensure that ALL regulations
are observed.
Fig. R.1
Preliminary remarks
This appliance should only be
installed in conjunction with a Vaillant
flue system.
Install the flue system as detailed in
the separate flue installation
instructions supplied with this boiler.

GENERAL REQUIREMENTS

Related Documents

The installation of the boiler must be
in accordance with the relevant
requirements of Gas Safety
(Installation and Use) Regulations
1998, Health and Safety Document
No. 635 (The Electricity at Work
Regulations 1989), BS7671
(IEE Wiring Regulations) and the
Water Supply (Water Fittings)
Regulations. It should also be in
accordance with the relevant
requirements of the Local Authority,
Building Regulations, Building
Standards (Scotland) Regulations and
the relevant recommendations of the
following British Standards:
BS 5440: Flues and ventilation of
gas fired boilers not exceeding
70 kW net:
- Part 1: Flues
- Part 2: Ventilation
BS 5449: Specification for forced
circulation hot water for domestic
premises.
BS 5546: Specification for gas hot
water supplies for domestic premises.
BS 6700: Services supplying water
for domestic use within buildings and
their curtilages.
BS 6798: Specification for
installation of gas fired boilers not
exceeding 60 kW input.
BS 6891: Specification for
installation of low pressure gas
pipework up to 28 mm (R1) in
domestic premises (2
BS 7593: Treatment of water in
domestic hot water central heating
systems.
Institute of Gas Engineers Publication
IGE/UP/7/1998: Guide for
Installation in Timber Framed
Housing.
Important: The appliance must be
installed and serviced by a
competent person as stated in the
Gas Safety (Installation and Use)
Regulations 1998.
family gas).
nd
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Turbomax pro 2 eTurbomax pro 28/2 e

Table of Contents