Automatic Air Release; Automatic Bypass - Vaillant ECOmax VUW 236 EH Instructions For Installation And Servicing

Table of Contents

Advertisement

Undo the 3 pump screws (3, fig.
82).
Pull pump forward to remove.
Remove back of control box by
undoing 2 screws (1, fig. 78).
Disconnect pump supply plug and
lift clear of board.
Fit new `0' rings (supplied with
pump) to connecting tubes.
Reassemble in reverse order.
Recommision boiler (see Section 5).
7.15 Replacement of automatic
air release (fig. 82)
Turn off boiler as in Section 7.1.1.
Release CH water pressure and
drain boiler as in Section 7.1.2.
Remove front casing as in Section
7.1.3.
Lower front control panel as in
Section 7.1.6.
Unscrew cap (4) of auto air release
and remove inner components.
Replace with new inner compo-
nents and reassemble in reverse
order.
Refill and repressurise the boiler
(see Section 5.4).
7.16 Replacement of automatic
bypass
Turn off boiler as in Section 7.1.1.
Release CH water pressure and
drain boiler as in Section 7.1.2.
Remove front casing as in Section
7.1.3.
Lower front control panel as in
Section 7.1.6.
Remove spring clip (2, fig. 83) by
lifting upwards.
fig. 82
fig. 83
49

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecomax vuw 286 eh

Table of Contents