Fluke 753 User Manual page 84

Documenting process calibrator
Hide thumbs Also See for 753:
Table of Contents

Advertisement

753/754
Users Manual
12. More delay time can be input for the process instrument
to become stable than the Product's usual settling time
(about 2 seconds). To change the delay time, input that
time in seconds for Delay.
13. Push  and  to move the cursor down to record 0%
and 100% values for SOURCE temperature. Our
example uses 100 °C and 300 °C.
14. If the instrument calibration procedure requires you to
manually record the measurement value or source,
push the User Value softkey, for user-recorded values.
Custom Units lets you specify user units such as PH.
See "Creating Custom Measurement Units", given
before in this manual for an example.
When you use custom units,  is shown next to the
value on the display and in results.
Push the Done softkey after the custom unit has been
programmed.
72
info@Fluke-Direct.ca
15. The Test Strategy is the number of test points and
which test points are performed rising and falling in
percent of scale. This example uses five points (0 %,
25 %, 50 %, 75 %, and 100 %), rising only. Rising is
indicated by the up arrow on the display. Push  to
change to a different test strategy on this line. A list of
strategies is shown from which to choose. Select one,
and then push the Done softkey.
16. When you are done recording the calibration
parameters, the display should change to the screen
shown in Figure 31.
Figure 31. Calibration Parameters Screen
Fluke-Direct
.ca
1.800.868.7495
gks45s.bmp

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

754

Table of Contents