Displaying Total Data By Outdoor Unit; Main Sub - Panasonic CZ-256ESMC2 Operation Manual

Hide thumbs Also See for CZ-256ESMC2:
Table of Contents

Advertisement

6 Using the System

6.5.3 Displaying total data by outdoor unit

Use this screen to check total data such as the operating time and the number of operations for
each outdoor unit.
Procedure
Select 2.Total data/Cut-off in the main menu and 3.Each O/D unit in the sub menu.
1 Selects the connection destination link system to display.
2 Selects either the current or the past (maximum 24 months) cut-off data.
1.Status/Control
2.Total data/Cut-off
3.Distrib. ratio/Usage
4.Maintenance/Test Run
5.Initial settings
6.Auxiliary settings
• You should make frequent checks of the running time after oil exchanges. When the time approaches
for an oil exchange, contact your dealer or service provider to request an early oil exchange. The
engines of GHP type outdoor unit can be damaged by operation without exchanging the oil.
• For double multiple models comprising two or more outdoor units with the same address, data with a
typical unit are displayed.
• Depending on the model of the outdoor unit, some items may not be displayed.
• Monthly values are displayed for "Operating time" and "Operating count". (The values reset to "0" after
cut-off processing.)
• Cumulative values from the starting point are displayed for "Running time after oil exchange (Hour)" and
"Power output (kWh)". (The values do not reset to "0" even after cut-off processing.)
1.Each I/D unit
2.Each tenant
3.Each O/D unit
4.Pulse meter
5.Cut-off/Data backup
Intelligent Ctrl-1
Intelligent Ctrl-2
Adapter 1-1
Adapter 1-2
:
Adapter 7-2
41
3
2
3
2
Main
Sub

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents