Oki S900 Engineer's Installation Manual page 23

Scancopier
Hide thumbs Also See for S900:
Table of Contents

Advertisement

3.
Close the ADF document cover and raise the ADF Tray (5) to an
angle of about 45 degrees.
5
4.
Pull down the legs (6) under the ADF Tray and locate them in
their support positions.
5.
Pull the ADF Tray extension (7) out until it is fully extended.
INSTALLING THE SCANCOPIER (AND ADF) > 23
English
7
6

Advertisement

Table of Contents
loading

Related Products for Oki S900

Table of Contents