HYOSUNG GT 650 Service Manual page 49

Table of Contents

Advertisement

◉ ENGINE SPOCKET
● Loosen the rear axle nut and chain adjusters, left
and right.
● Install the engine sprocket.
● Tighten the engine sprocket nut ① to the specified
torque.
Engine sprocket nut
: 130~160 N∙m (13.0~16.0 kg∙m)
NOTE
When tightening the engine sprocket nut,
depress the rear brake pedal.
● Bend the lock washer securely.
● Install the gearshift arm and adjust the gearshift lever
height.(Refer to page 2-9)
● Install the breather hose and engine sprocket cover.
● Connect each electric parts and its couplers.(Refer
to page 8-24~28)
● Install the exhaust pipes and mufflers.
● Install the carburetor and air cleaner. (Refer to
page 4-7)
● Install the radiator. (Refer to page 5-4)
● Af t e r r e m o u n t i n g t h e e n g i n e , t h e f o l l o w i n g
adjustments are necessary.
Engine idling speed
Throttle cable play
Clutch cable play
Drive chain
Gearshift lever height
Engine oil level
Engine coolant
Refer to page 2-7
Refer to page 2-8
Refer to page 2-9
Refer to page 2-12
Refer to page 2-9
Refer to page 2-9
Refer to page 2-20
ENGINE 3-8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents