Daikin FVKS25BVMB Service Manual page 162

Inverter pair floor standing type b-series
Hide thumbs Also See for FVKS25BVMB:
Table of Contents

Advertisement

SiBE06-514A
Step
3
Remove the sheets of
putty.
Cut the pipe with a tube
cutter.
Heat up the brazed part
4
and withdraw the piping
with pliers.
Removal Procedure
Procedure
Outdoor Unit
Points
Provide a protective sheet or
a steel plate so that the
brazing flame cannot
influence peripheries.
Be careful so as not to break
the pipes by pressing it
excessively by pliers when
withdrawing it.
153

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents