Weil-McLain 550 MBH Nstallation And Operation Manual page 39

Commercial condensing gas-fired water boilers
Hide thumbs Also See for 550 MBH:
Table of Contents

Advertisement

®
SlimFit
Series 3
DIRECT VENT — Sidewall
b. Apply the configuration on the right side of Figure 30 when
the terminations need to be raised higher to meet clearance to
grade or snow line.
c. The vent and air pipes may run up as high as 4 feet, as shown in
Figure 30 right side with no enclosure. The vent and air pipes
must be secured with braces, and all clearances and lengths
must be maintained. Space braces no further than 24 inches
apart. (See WARNING below for extremely cold climates.)
d. External venting greater than 4 feet requires an enclosure
around the vent and air pipes. The vent and air terminations
must exit through the enclosure as shown in Figure 30, main-
taining all required clearances.
3. The vent piping must terminate in an elbow pointed outward or
away from the air inlet, as shown in Figure 30.
Do not exceed the maximum lengths of the outside vent
piping shown in Figure 30. Excessive length exposed to
the outside could cause freezing of condensate in the vent
pipe, resulting in potential boiler shutdown. In extremely
cold climates, install an insulated chase around the vent
piping, particularly when using longer lengths. The chase
must allow for inspection of the vent pipe, and insulation
must be protected from water.
DIRECT VENT — Sidewall — configuration
options and minimum clearances from vent to air
terminations
4. Consider the surroundings when terminating the vent and air:
a. Position the vent termination where vapors will not damage
nearby shrubs, plants or air conditioning equipment or be
objectionable.
b. The flue products will form a noticeable plume as they con-
dense in cold air. Avoid areas where the plume could obstruct
window views.
c. Prevailing winds could cause freezing of condensate and water/
ice buildup where flue products impinge on building surfaces
or plants.
Part number 550-100-168/0516
COMMERCIAL CONDENSING GAS
-
FIRED WATER BOILER
(continued)
Sidewall termination with separate pipes
— clearances to openings
Sidewall termination with separate pipes
— clearances from vent exit to forced air
intake
Terminating with the vent elbow sideways
instead of pointed away from the building can
result in the possibility of ice build-up on the
side of the building.
If the vent/air pipes are extended out beyond
the wall, install a coupling at the exit opening,
with the coupling butted against the outside
plate. Then continue vent/air piping from the
coupling.
Boiler Manual
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

750 mbh

Table of Contents