Duct Work; Filters; Fresh Air Intake; Condensate Drain - Bard W12AAA Installation Instructions Manual

Wall mounted package air conditioners
Table of Contents

Advertisement

DUCT WORK

All duct work, supply and return must be properly sized
for the design air flow requirement of the equipment.
Air Conditioning Contractors of America (ACCA) is
an excellent guide to proper sizing. All duct work or
portions thereof not in the conditioned space should be
properly insulated in order to both conserve energy and
prevent condensation or moisture damage.
Refer to Table 8 for maximum static pressure available
for duct design.
Design the duct work according to methods given by
the Air Conditioning Contractors of America (ACCA).
When duct runs through unheated spaces, it should be
insulated with a minimum of one inch of insulation.
Use insulation with a vapor barrier on the outside of the
insulation. Flexible joints should be used to connect the
duct work to the equipment in order to keep the noise
transmission to a minimum.
Ducts through the walls must be insulated and all joints
taped or sealed to prevent air or moisture entering the
wall cavity.
Some installations may not require any return air duct.
It is recommended that on this type of installation that
a filter grille be located in the wall. Filters must be of
sufficient size to allow a maximum velocity of 400 FPM.
NOTE: If no return air duct is used, applicable
installation codes may limit this cabinet to
installation only in a single story structure.

FILTERS

A one inch throwaway filter is supplied with each unit.
The filter slides into position making it easy to service.
This filter can be serviced from the outside by removing
the service door. A 2-inch pleated filter is also available
as an optional accessory. The internal filter brackets are
adjustable to accommodate the 2-inch filter by bending
the metal tabs holding the 1-inch filter down. There are
two tabs on each side of the filter.

FRESH AIR INTAKE

All units are built with fresh air inlet slots punched in the
service panel.
If the unit is equipped with a fresh air damper assembly,
the assembly is shipped already attached to the unit. The
damper blade is locked in the closed position. To allow
the damper to operate, the maximum and minimum blade
position stops must be installed. See Figure 2.
All capacity, efficiency and cost of operation information
as required for Department of Energy "Energyguide"
Fact Sheets is based upon the fresh air blank-off plate
in place and is recommended for maximum energy
efficiency.
The blank-off plate is available upon request from the
factory and is installed in place of the fresh air damper
shipped with each unit.

CONDENSATE DRAIN

A plastic drain hose extends from the drain pan at the top
of the unit down to the unit base. There are openings in
the unit base for the drain hose to pass through. In the
event the drain hose is connected to a drain system of
some type, it must be an open or vented type system to
assure proper drainage.
FIGURE 2
FRESH AIR DAMPER
Manual
2100-618
Page
7 of 21