2 - SYSTEM TEST CONFIGURATION
2.1 Justification
The system was configured for testing in a typical fashion (as normally used by a typical user).
2.2 EUT Exercise Software
The EUT exercising program used during radiated and conducted testing was designed to exercise the
various system components in a manner similar to a typical use. The software offered by manufacture, can
let the EUT being normal operation.
2.3 Special Accessories
As shown in section 2.6, interface cable used for compliance testing is shielded as normally supplied by
Grandstream Networks,Inc., and its respective support equipment manufacturers.
2.4 Block Diagram
Please refer to the Appendix D.
2.5 Equipment Modifications
No modifications were made by BACL to ensure EUT to comply with the applicable limits and
requirements.