Install Motion Control Levers; Bolt 5/16-18 X 1" (26 Mm); Spring Washer 3/8 - Toro 74200 Operator's Manual

Traction unit z-master 250 series
Hide thumbs Also See for 74200:
Table of Contents

Advertisement

Assembly

Install Motion Control Levers

9.
Remove the (4) 3/8–16 x 1" (26 mm) bolts and
(4) 3/8 spring washers which attach the motion
control levers to the control arm shafts for
shipping (Fig. 3).
10. Place the levers (with the mounting plate
towards the rear) on the outside of the control
arm shaft and secure with (4) 3/8–16 x 1"
(26 mm) bolts and (4) 3/8 spring washers
(Fig. 3).
11. Position the lever so the bolts are in the center of
the slots on the lever mounting plate and tighten
until snug.
12. Align the front\rear position of the levers, with
each other, in the neutral position. Loosen
hardware and adjustment by sliding/tilting the
lever(s) forward or backward until properly
aligned(Fig. 3).
2
3
Figure 3
1. Mounting plate
2. Bolt 3/8–18 x 1" (26 mm)
12
1
m–3751

3. Spring washer 3/8"

13. If the ends of the levers hit against each other,
while in the drive position (Fig 4) (levers rotated
in as far as possible).
14. Make adjustments by moving the levers
outwards to the neutral lock position and
carefully bend them outward. Move them back
to the drive position and check for clearance,
repeat if necessary.
Figure 4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z-252

Table of Contents