Installation Diagram Of Indoor Unit And Outdoor Unit - Samsung ASH-0906ER Service Manual

Table of Contents

Advertisement

3-2-2 Installation diagram of indoor unit and outdoor unit

A Indoor unit gas leak test check point
Indoor
unit
Piping
B Drain hose installation
Cut the piping hole
sloped slightly
Samsung Electronics
Tape Vinyl
Piping (Liquid) 1/4"
Piping (Gas) 1/2"
Installation tube
Vinyl tape
Putty
Operating Instructions and Installation
Piping may be laid to the rear, left,
right or down .
Right
Rear
Down
450mm or more
A
B
Remote control
Remote control holder
Clamper tube
Installation plate
Pipe-connection
Screw
Drain hose
Left
Rear
400mm or more
3-5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ash-1206er

Table of Contents