Mitsubishi MSZ-HJ25VA Service Manual page 34

Muz-hj-va series; mxz-hj-va series
Hide thumbs Also See for MSZ-HJ25VA:
Table of Contents

Advertisement

OPERATING PROCEDURE
3. Removing the indoor electronic control P.C.
board
(1) Remove the panel. (Refer to 1.) Remove the right corner
box.
(2) Disconnect the following connectors:
<Indoor electronic control P.C. board>
CN151 (Vane motor)
CN112 (Indoor coil thermistor)
CN10A (To the indoor power P.C. board)
(3) Unhook the catch on the left side of the control P.C.
board holder. Pull the control P.C. board holder as if
opening the door at 90 degrees. Remove the control P.C.
board holder from the axial rod on the electrical box.
(4) Remove the room temperature thermistor from the back
side of the control P.C. board holder.
(5) Unhook the catches of the control P.C. board holder, and
open the control P.C. board holder.
(6) Remove the indoor electronic control P.C. board from the
control P.C. board holder.
4. Removing the vane motor
(1) Remove the panel. (Refer to 1.) Remove the right cor-
ner box.
(2) Remove the control P.C. board holder and the electrical
box. (Refer to 2.)
(3) Pull out the drain hose from the nozzle assembly and
remove the nozzle assembly.
(4) Remove the screws of the vane motor and remove the
vane motor.
(5) Disconnect the connector from the vane motor.
OBH647C
Photo 4
Control P.C. board holder (Inside)
Control P.C. board holder (Back side)
Photo 5
Screws of the
vane motor
34
PHOTOS
Catch
Indoor electronic
control P.C. board
Catch
Room temperature thermistor

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents