Air Cooled Chimney Installation - Napoleon NZ6000-1 Installation And Operating Instructions Manual

Table of Contents

Advertisement

20
4.7

AIR COOLED CHIMNEY INSTALLATION

A.
Remove the knock out.
B.
Cut away the insulation to gain access to the ring.
C.
Remove the ring secured by four screws.
D.
Slide the starter collar through the insulation wrap and
affi x using the four screws removed in step 3.
E.
Secure the inner liner of the chimney to the appliance
8" (203mm) collar using 3 screws supplied with the
starter collar (W170-0098).
F.
Follow the chimney manufacturer's instructions for
installing the chimney.
Use only the following brand and type of chimney.
CHIMNEY COMPONENTS
12" (304.8mm) Chimney Section
18" (457.2mm) Chimney Section
24" (609.6mm) Chimney Section
36" (914.4mm) Chimney Section
48" (1219.2mm) Chimney Section
Offsets
Flashing
Chimney Cap
Roof Support
Firestop
CHIMNEY COMPONENTS
Starter Collar
FMI 8DM
12-8DM
18-8DM
24-8DM
36-8DM
48-8DM
30E-8DM
6F8 or 12F8
RTL-8HT
38 RS
FS-8DM
WOLF STEEL
NZAC-KT
STARTER COLLAR
4
3
RING
1
KNOCK-OUT
2
INSULATION

Advertisement

Table of Contents
loading

Table of Contents