Further details regarding the individual steps
Installing the burner
Checking the inspection ports for leaks
Danger
Boiler components that are not
thermally insulated can be sub-
ject to high temperatures that
can result in burns.
Take care with hot surfaces.
Commissioning, inspection, maintenance
(cont.)
1. Secure burner plate B with
screws A to burner flange C.
2. For pressure-jet gas burner:
Fit the gas supply pipe.
Danger
Escaping gas leads to a risk
of explosion.
Test the soundness of all
gas connections.
Note
Replace the gaskets every time a con-
nection has been opened.
Insert only gaskets approved in accor-
dance with TRD 401, appendix 1,
VdTÜV [or local regulations].
Installation instructions of the
gasket manufacturer.
17