Neo 1.2 Firebrick Installation Instructions - Pacific energy NEO 1.2 EU A SERIES Owners Manu

Table of Contents

Advertisement

NEO 1.2 Firebrick Installation Instructions

This package contains 6 full-size firebricks as well as 6 various cut-size bricks.
With the heater in the upright position, install firebricks as follows:
Place 4 full-size firebricks "C" at the back of the heater first.
Next, install the side firebricks, 1 full-size brick "C" and 1 brick "B" on each side above brick "C" sliding it
back behind the rear brick retainer.
Lastly, install "A" and "D" firebricks as shown in the bottom of the firebox.
Figure 12: NEO 1.2 Firebricks.
A
B
C
D
120416-24_ NEO 1.2
B
D
A
D
ITEM
Complete Brick Set .......................................................... NE12.BRIC-A
4 1/2" X 5 1/2" X 1 1/4" ............................(39 mm x 115 mm x 32 mm)
3" X 4 1/2" X 1 1/4" ...................................(77 mm x 115 mm x 32 mm)
9" X 4 1/2" X 1 1/4" .................................(230 mm x 115 mm x 32 mm)
4 1/2" X 5 1/2" X 1 1/4" (Clipped) .............(39 mm x 115 mm x 32 mm)
C
Part Number
21
Installation Instructions
B
5055.600EU-A

Advertisement

Table of Contents
loading

Table of Contents