Pacific energy NEO 1.2 EU A SERIES Owners Manu page 20

Table of Contents

Advertisement

Installation Instructions
The chimney may incorporate
an offset. To do this safely,
all sections of listed connector,
offset elbows and chimney
section must be screwed
together by at least three sheet
metal screws per joint. The
chimney must be suitably
supported by the chimney
manufacturer's listed offset
support
5055.600EU-A
Follow chimney manufacture specifcations for
distance between vent termination heigth and
chimney at roof line. Also consult local building
regulations.
Minimum 7' (2.1m.)
Ceiling Height
52" (1.32m)
Minimum
48"
(1219 mm)
Attach to oor for
mobile homes
3" diameter air inlet with rodent screen.
If the crawl space is well ventilated it is not
necessary to extend air inlet to outside
Figure 11: Common residential venting configuration.
Certi ed
Chimney
Storm collar
as per Local
and Federal
codes
Chimney
12"(305mm)
connector
Minimum rst
section of pipe
20
Spark arrester
rain cap
Roof
ashing
Chimney Support
Wall Thimble
Alternate up and
out installation
*
*
Unit may be harder
to start. Please provide
as much vertical length
for the rst section
of pipe as possible
Non-combustible
oor protector
Hooded vent or
90 elbow turned down
120416-24_ NEO 1.2

Advertisement

Table of Contents
loading

Table of Contents