Verifying A Successful Installation - Nortel Contivity 1700 Installing Manual

Hide thumbs Also See for Contivity 1700:
Table of Contents

Advertisement

Verifying a successful installation

After you connect the gateway to the power outlet and turn it on, you can verify a
successful installation by checking the LEDs on the front panel
The following sequence of LEDs should occur:
1
2
3
4
If the LEDs on the front panel light in this sequence, your installation is
successful. If the LEDs do not light in this sequence, check that the bezel is on the
gateway and that the power cord is properly attached to the power supply (see
"Connecting the power cord" on page
If the Contivity 1700 still does not boot, contact your local Nortel Networks
Technical Solutions Center (see
Chapter 2 Cabling the gateway and turning the power on 33
The power LED (the Nortel Networks logo) lights blue.
As the gateway boots, the Boot/Ready LED lights yellow.
When the boot process completes successfully, the Boot/Ready LED lights
green, indicating that the gateway is operational.
The Alert/Fail LED lights yellow because the gateway is not configured.
For a newly installed Contivity 1700, a yellow Alert/Fail LED does not
indicate an alarm condition. After you configure the management IP address
on the gateway, the Alert/Fail LED turns off. (See
management IP interface," on page
43.)
32).
"How to get help" on page
(Figure
8).
Chapter 3, "Configuring the
18).
Installing the Contivity 1700

Advertisement

Table of Contents
loading

This manual is also suitable for:

Contivity 1740

Table of Contents