Pitney Bowes DM125 Installing Manual page 6

Hide thumbs Also See for DM125:
Table of Contents

Advertisement

2. Remove Shipping Tape
Open the top cover of the meter and remove any packing material, protective foam, tape that may be
present. After done you can close the cover.
3.Install Additional Components
A. Scale
If your system came with the optional scale, attach it now.
The scale consists of two pieces. Place the platform on top of
the base unit, being sure the pegs on the platform are inserted
into the corresponding holes in the base unit.
Position the assembled scale as shown. Now plug the
connector on the bottom of the base unit into the matching
connector on your system.
B. Moistener
The optional moistener allows you to moisten, seal, and apply
postage to your envelopes all in one smooth step. Position the
moistener on the left side of the deck as shown. Hold down the
blue release lever and slide moistener from left to right, with the
lip of the moistener above the deck.
platform
base unit
release lever
moistener
page 5

Advertisement

Table of Contents
loading

Table of Contents